References

Some of our main projects are listed below.

Main Projects

New Vehicle Registration Office Wiesbaden

New construction of the registration office in Wiesbaden...

Read More

Stegstraße Ginsheim-Gustavsburg

The municipal housing company Ginsheim-Gustavsburg...

Read More

STAU -Kelsterbach

Stau-Kelsterbach

Read More

LSA1 Wiesbaden

USAG Wiesbaden containerized...

Read More

DRK Senior Centre – Wiesbaden Nordenstadt

Nursing places are created on Hainweg and ...

Read More

Schönau-Quartier Wiesbaden

Living in the Schönau district In Wiesbaden-Schierstein, GWW...

Read More

SAS Upgrade Ma’aden Aluminium – Ras Al-Khair

Complete Design, Commissioning of the new SCADA control center for Ma'aden - Aluminum

Read More

FDC‐ Field Data Collection Saudi Arabia

Main Target of PDMS Project was establishing comprehensive Enterprise Protection Information System (EPIS) across NG Saudi Arabia.

Read More

Reference List

DateProject nameServicesDescriptionEquipment
2023-2024New Vehicle Registration Office WiesbadenElectrical installation for:- Power installations
-Low-current installations
2023-2024DRK Senior Centre - Wiesbaden NordenstadtElectrical installation for:- Power installations
-Low-current installations
2023-2024STAU KelsterbachElectrical installation for:- Power installations
-Low-current installations
2023-2024Stegstraße Ginsheim-GustavsburgElectrical installation for:- Power installations
-Low-current installations
2023-2024Mathilde WiesbadenElectrical installation for:- Power installations
-Low-current installations
2023LSA 1 WiesbadenElectrical installation for:- Power installations
-Low-current installations
2023-2024
Mainz Kostheim Am Sägewerk 4Electrical installation for:- Power installations
-Low-current installations
2023-2024
DotzheimerStr. Wiesbaden - ENESKAElectrical installation for:- Power installations
-Low-current installations
2023-2024
Waldgärten DarmstadtElectrical installation for:- Power installations
-Low-current installations
2023-2024
Mathilde WiesbadenElectrical installation for:- Power installations
-Low-current installations
2022-2023Schönau-Quartier WiesbadenElectrical installation for:- Power installations
-Low-current installations
2021-2022EO Bad HomburgElectrical installation for:- Power installations
-Low-current installations
2021-2022Hahner Mitte – TaunussteinElectrical installation for:- Power installations
-Low-current installations
2021-2022Quartier Kaiserhof -WiesbadenElectrical installation for:- Power installations
-Low-current installations
2021-2022HSK WiesbadenElectrical installation for:- Power installations
-Low-current installations
2021-2022Rowg KriftelElectrical installation for:- Power installations
-Low-current installations
2021-2022Spinelli MannheimElectrical installation for:- Power installations
-Low-current installations
2020-2022Senior Living Advita Bad WindsheimElectrical installation for:- Power installations
-Low-current installations
2020-2021Zebra - FrankfurtElectrical installation for:- Power installations
-Low-current installations
2020-2021Postareal LörrachElectrical installation for:- Power installations
-Low-current installations
2020-2021Heimatufer Ludwigshafen Electrical installation for:
- Power installations
-Low-current installations
2020-2021Am Gänsberg IngelheimElectrical installation for:- Power installations
-Low-current installations
2014-2015Reconstruction of substation 400/110 kV Bitola2, N MacedoniaElectrical engineering and Automation
Design
-Design, configuration, P2P testing and commissioning of SCADA system,
-Two SCADA application on one server, Remote connection to SCADA application
-COM500 configuration
-Configuration of ABB REC670
-Wiring checking in protection panels
-Goose Messages
-Checking interlocks on Busbar system(Earthswitch and Disconnector)
ABB Micro SCADA 9.3, ABB REC670, ABB REF670, ABB REL670, ABB REB670, ABB REF600, RUGGEDCOM RSG2100 i RUGGEDCOM ROUTER
2014-2015Gas Power Plant Labreg, AlgeriaElectrical engineering and Automation-Configuration, P2P testing and commissioning of Siemens SCADA system
-Configuration and commissioning of protection relays
Siemens Sicam PAS 6.0 i Win CC 7.0
2019Bildungscampus III Heilbronn,Electrical installation for:- Power installations
-Low-current installations
2019CureVac Tübingen,Electrical installation for:- Power installations
-Low-current installations
2018SS 13M 115kV, SS10J 115kV and SS131, SS132 33kV (cca. 140 mil USD)Electrical engineering and Automation
Design
-Project management and Financial managementSiemens and ABB equipment
2017Upgrade of SCADA system in Hadeed Iron and steel, KSAElectrical engineering and Automation-Configuration, P2P testing and commissioning of Siemens SCADA system
-Configuration and commissioning of protection relays
-Sinaut LSA configuration
Siemens SICAM PAS 6.0 and WIN CC 6.0, Siprotec 4, Siemens Sinaut LSA
2017Consultancy to perform the RCA (root cause analysis) for CB (circuit breaker 220 kV) flashoverConsultancy-Project management and Financial management
- -RCA,Consultancy
N/A
2017SAS system upgrade in Dispatch Center,Maaden Aluminum Smelter, Jubail, KSAElectrical engineering and Automation
Design
-Project management and Financial management
- Instllation, configuration and comissioning
ProzaNET, Ruggedcom, ABB REF600. ABB REF541, Schneider MiCOM, Schneider SCADA
2016Advanced protection data management system with field data collection in real time, Asset Management, KSA (cca. 30 mil USD)Electrical engineering and Automation-Field data collection in real time from almost 900 HV substation
-Project management and Financial management
-Management for 7 IPS teams (30-35 engineers)
-Work organisation for all member of 7 Teams
-Organization for all members of 7 Teams for Accommodation, transportation, site permit, site visit
IPS CLOUD, IPS EPIS, IPS; ENERGY, Experience in work with 983 different type of relays (ABB, Siemens, Schneider, Toshiba, Mitsubishi, Alstom, GEC, GE, etc..)
2016Reconstruction of 400 kV substation Ferizaj 2, KosovoElectrical engineering and Automation-Configuration, P2P testing and commissioning of Siemens SCADA system
-Configuration of protection relays
Siemens Sicam PAS 8.0 i Win CC 8.0, Siprotec 4
2015RTU In ADRAR, ALGERIAElectrical engineering and Automation-Configuration of RTU in Three substations, P2P testing and commissioningABB RTU560, RuggedcomRS2100, REF600, Rex670
2015SCADA system in Al Baha, KSAElectrical engineering and AutomationConfiguration of SCADA systemABB Micro SCADA
2015Gas Power Plant Sousse D, TunisiaElectrical engineering and Automation-Configuration, P2P testing and commissioning of Siemens SCADA system
-Configuration and commissioning of protection relays
Siemens Sicam PAS 8.0 i Win CC 8.0, Siprotec 4
2014Reconstruction of SCADA system in Dispatch Center ED ZenicaElectrical engineering and Automation
-Upgrade of SCADA in Dispatch center from v8.6.5 to v9.3
-Upgrade and configuration of Siemens RTU-s (TM1703) in 6 substations
-Upgrade and configuration of ABB RTU-s(RTU560 and COM600) in 7 substations
ABB Micro SCADA 9.3, ABB REF600, RUGGEDCOM, SIEMENS RTU TM1703, ABB COM600, ABB RTU560
2013ABB RTU560 SarajevoElectrical engineering and Automation
Design
-Configuration of RTU
-P2P testing and commissioning
-Cable laying, Wiring testing
-Design, As Built
ABB RTU560
2012El Merk Algeria -ABB ItalyElectrical engineering and Automation
Design
-Design and configuration of HMI
- Point2Point testing and commissioning
ABB RTU560